This part of IEC 62257 provides information on the responsibilities involved in the implementation of rural power systems. In Clause 5, this technical specification presents contractual relationships to be built between the different participants to a project. Throughout the project, responsibilities are to be clearly defined and contractual commitments controlled. Clause 6 provides relevant tests to be applied to renewable energy and hybrid electrification systems. Clause 7 provides proposed quality assurance principles to be implemented. In Clause 8, requirements are proposed for recycling and protection of the environment. In Annex A of this technical specification, further technical considerations for contractual liabilities are provided.
IEC/TS 62257-3-2015由國際電工委員會 IX-IEC 發布于 2015-12。
IEC/TS 62257-3-2015 在中國標準分類中歸屬于: F21 電力系統,在國際標準分類中歸屬于: 27.160 太陽能工程。
IEC/TS 62257-3-2015 由 IEC/TS 62257-3-2004 變更而來。
非常抱歉,我們暫時無法提供預覽,您可以試試: 免費下載 IEC/TS 62257-3-2015 前三頁,或者稍后再訪問。
點擊下載后,生成下載文件時間比較長,請耐心等待......
Copyright ?2007-2022 ANTPEDIA, All Rights Reserved
京ICP備07018254號 京公網安備1101085018 電信與信息服務業務經營許可證:京ICP證110310號